NIPPON MARU

$399.00

  • 100% hand built from scratch using “plank on frame” construction method
  • Hundreds of hours  required to finish this model sailboat
  • Made of finest wood and high quality material
  • Highly complex rigging and metal fitting
  • Included a solid wood/MDF base and a brass name plate

Out of stock

SKU: TS0075P Category:

Description

The Nippon Maru was built in 1930, brought up 11,425 trainees over a little more than 54 years to retirement, and completed about 1,830,000km voyage.

Although the former Nippon Maru had continued the brilliant voyage participating in ceremony of the 200th U.S. founding of the country anniversary (1976) etc., after 1974 with superannuation, it reduced the scale of ocean navigation and was continuing the temporary voyage.

In 1981, the investigation about construction of The Nippon Maru II was started and basic concept of the construction was summarized.

The fixed plans of construction were as follows.

Fundamental engineering education etc. were taken into consideration based on the former Nippon Maru and another sailing ship Kaiwo Maru.
In consideration of years of operation, it had a fine sight as it was strong, and it considers as a dignified thing.
It took into consideration enough also about hull intensity, restitutive force, a trim, sound isolation, vibration-proof, and heat-proof.
While being equipped fully with educational equipment required for training adaptability, discipline, a sense of cooperation, and international mindedness that were indispensable elements for ship’s officers.
It took into consideration of a comfortable environment and living space on the ship in which people enable to live healthfully as much as possible.
In 1982, the budget about construction of The Nippon Maru II was accepted, and it became progress of construction. The schedule from planning to complete the construction was as follows.

11th APR. 1983 :Keel was laid at Sumitomo Heavy Industries, Ltd.
16th SEPT. 1983 :Block loading was started..
14th DEC. 1983 : The first mast (a jigger mast, mast at the tail end) was mounted.
15th FEB. 1984 : Launching ceremony was celebrated in the presence of the Crown Prince and Princess.
16th SEPT. 1984 : Construction was completed and it was handed over. The first trainee was accepted and the maiden voyage was started.
The sailing performance of The Nippon Maru II was more wonderfully higher than the former Nippon Maru.

It was awarded several times with The Boston Tea Pot Trophy.

Reviews

There are no reviews yet.

Be the first to review “NIPPON MARU”

Your email address will not be published. Required fields are marked *

Shipping & Terms

  • Your item will normally be shipped within one or two business days after receiving payment. We will update tracking number of your shipment.
  • We use USPS, FedEx, and UPS for standard shipping. Please contact us if you prefer an express service. Standard or free shipping is just for customers in Lower 48 States.
  • Please contact us for shipping rate if you want to ship to Alaska, Puerto Rico, Hawaii or other countries. We reserve the right to decline shipping to some countries for safety reason of the package.
  • International customer: Customer will be responsible for any taxes/duties at your country. Please contact your customs for import regulation
  • Guarantee to arrive safety. All shipments are FULLY INSURED with professional 100% secure packing
  • Damaged in transit: If you’ve found damage to the package please keep the original shipping carton/shipping label. Contact us immediately within 4 days so we can issue a damage claim with carrier. If the item damaged inside a wooden crate, please do not continue to open wooden crate, contact us immediately for instruction.
  • Please contact us first if you want to ship to APO/FPO/PO Box addresses. We are not responsible for extra shipping cost if the package denied for any reasons
  • Orders are shipped on business days only. Business days are Monday-Friday, excluding federal holidays within the United States. If you place an order after 2PM of Friday we will process on next Monday.